SEAL Team Facility

Designed for SEAL Team operations, the facility houses and co-locates training, administrative, transportation, and maintenance functions.

Located on the water, the facility needed to resist the harsh marine environment as well provide direct access and cover for personnel. Boat ramping and launch functions were developed with direct connections to the primary facility.

Large hangar spaces are daylight with diffuse light from translucent wall panels and exterior shading and privacy screening.

Area: 58,320 SF

Design + Construction: 23 months

Cost: $31,400,000

Client: Naval Facilities Engineering Command

 

Long Span

Long span structural systems were used to overarch training and vehicle bays.This allowed walls to be freed up for great expanses of translucent panels, but to also freeing the large spaces of any columns to get in the way of operations.